Volkswagen Delays Development of EVs Based on SSP

Volkswagen has announced delays in the development of the all-electric Golf and Audi A4 E-Tron, with the Golf EV's launch pushed to 2030. The delays stem from cost-cutting measures and complications with the Scalable Systems Platform (SSP), which is taking longer to develop than anticipated. This impacts Audi's competitiveness in the luxury EV market as well.

Volta KessrinModels, Pricing & Buying

1 min read1 source

Key takeaways

30-second read
  1. 1The delay of the Golf EV until 2030 may affect buyers looking for affordable electric options in the near future.
  2. 2Audi's A4 E-Tron delay until 2029 could hinder its competitiveness against rival luxury EVs like the BMW i3 and Mercedes-Benz C-Class EV.
  3. 3These delays may lead to uncertainty in pricing and availability for consumers considering these models.
  • Confirmed

    No official source linked yet

  • Reported

    Secondary reporting: Electrek

  • Verify yourself

    Eligibility, local prices and dates for your car, state or utility

Volkswagen Delays Development of EVs Based on SSP

Volkswagen has confirmed delays in the development of two key electric vehicles: the all-electric Golf and the Audi A4 E-Tron. The Golf EV, which was initially slated for a 2028 launch, has now been pushed back to 2030 due to ongoing cost-cutting measures and complications with the Scalable Systems Platform (SSP). According to Volkswagen brand CEO Thomas Schäfer, the Wolfsburg plant is facing a shortfall of approximately €300 million ($334.5 million) in its cost-cutting targets, leading to this postponement.

The Audi A4 E-Tron is also experiencing a significant delay, with production now expected to begin in 2029, a year later than originally planned. This delay is particularly concerning for Audi as it falls behind competitors in the mid-size luxury sedan segment, where brands like BMW and Mercedes-Benz are already making strides with their electric offerings.

The SSP, which Volkswagen is developing in partnership with Rivian, is intended to serve as a unified platform for future electric vehicles, promising reduced investment and R&D costs. However, the development has faced setbacks, partly due to Audi's demands for modifications to better align the A4 E-Tron with its gasoline counterpart. These changes include the need for individual footwells for passengers and a shift to a 48V electrical system.

While Volkswagen's works council has assured that the delay will not impact the Golf EV's launch timeline, the uncertainty surrounding both models raises questions for potential buyers. With the EV market rapidly evolving, these delays could affect consumer choices and the competitive landscape in the electric vehicle sector.

0 people like this

Share this story

VolkswagenAudiEV DelayGolf EVA4 E-Tron

Sources

1 media
  1. [1]
    Volkswagen is delaying another EV based on the SSP

    Electrek · electrek.co · published Nov 13

    Media
This brief was drafted with AI and published automatically after checks on its sources and content; an editor has not reviewed it. We update stories when verified details change and prioritize source-linked reporting over generic filler. Read our editorial standards or send a correction via contact.

Newsletter

Weekly EV signal. No spam.

Comments

Log in with

Loading comments…